6. Basic troubleshooting guide intended to
identify the source of system problems.
7. Overall system configuration and restore
procedures.
C. Engage a factory-authorized service
representative to train Owner's maintenance
personnel to adjust, operate, and maintain
intrusion detection.
3.6 ON-SITE ASSISTANCE
A. Occupancy Adjustments: Within one year of date
of Substantial Completion, and each subsequent
year, provide up to three (3) Project-site
visits, when requested by Owner, to adjust and
calibrate components and to assist Owner's
personnel in making program changes and in
adjusting equipment and controls to suit actual
conditions. Visits for this purpose shall be in
addition to any required by warranty.
3.7 OUTSIDE CONSTRUCTION
A. The contractor shall provide all conduit,
coupling, hardware and all other materials
necessary for a proper and first class
installation. Direction changes should be as
gradual as possible using telecommunication rated
sweeps where necessary. Direction changes made
by skewing straight sections of conduit will not
be accepted. Angle couplings and bends alone in
combination with straight sections should be used
for direction changes. When placing conduit in
the field, it is preferred that the vendor use
on-site heat bending to accomplish angles that do
not fall into standard 45 or 90 degree
increments. Radius of sweeps and bends shall not
be less than 3'. LB’s are not permitted at any
juncture of conduit path.
B. Each trench to each parking lot light pole, as
shown on Security drawings, shall have a minimum
of two (2) 2" conduits.