manufacturer. Do not install such items near
devices they serve.
G. Identify components with engraved, laminated-
plastic or metal nameplate for central-station
control unit and each terminal cabinet, mounted
with corrosion-resistant screws.
3.1 GROUNDING
A. Ground system components and conductor and cable
shields to eliminate shock hazard and to minimize
ground loops, common-mode returns, noise pickup,
cross talk, and other impairments.
B. Signal Ground Terminal: Locate at main equipment
rack or cabinet. Isolate from power system and
equipment grounding. Provide 5 -ohm ground.
Measure, record, and report ground resistance.
3.4 FIELD QUALITY CONTROL
A. Pre-testing: After installation, align, adjust,
and balance system and perform complete pre-
testing to determine compliance of system with
requirements in the Contract Documents. Correct
deficiencies observed in pre-testing. Replace
malfunctioning or damaged items with new ones and
retest until satisfactory performance and
conditions are achieved. Prepare forms for
systematic recording of acceptance test results.
1. Report of Pre-testing: After pre-testing is
complete, provide a letter certifying that
installation is complete and fully operable;
include names and titles of witnesses to
preliminary tests.
2. Final Test Notice: Notify Owner at least 10
days in advance of final acceptance testing.
B. Manufacturer's Field Service: Engage a factory-
authorized service representative to
inspect, test, and adjust field-assembled
components and equipment installation, including