ROOM SEALED FLUE OPTIONS
INSTALLATION & SERVICING INSTRUCTIONS FOR WORCESTER GREENSTAR UTILITY 32/50 & 50/708 716
109 711B 07.2010
18
PRE -
INSTALLATION
ROOM SEALED FLUE OPTIONS
The diagrams (opposite) show the components
used and the maximum flue length (L) from
the boiler outlet to the ouside wall*/roof of the
building for each flue configuration.
In all cases L is measured from the outside of
the boiler casing.
• To achieve the maximum flue length (L), a flue
section will have to be reduced in length.
• Only the flue terminal or straight flue
extensions can be reduced in length by
cutting.
• The flue terminal end can be fitted from the
inside or outside of the building.
IMPORTANT: All horizontal sections must
rise away from the boiler by 52mm per
metre (3°) to allow the condensate to
drain back to the boiler.
A - Horizontal terminal
B - Straight flue extension
C - Flue bend 90°
D - Flue bend 45°
E - Vertical Terminal
F - 90° inner elbow - inner flue to boiler
G - Air intake box
Calculating the flue length:
Measure the total flue length required, noting
that the maximum straight flue length including
the terminal is:
Horizontal 100/150mmØ: 3000mm (excluding
220mm of terminal extending outside the building)
Vertical 100/150mmØ: 6000mm (measured
from the boiler top panel).
Then reduce the total straight flue length for
each extra flue bend (excluding the vertical flue
kit 90° elbow) by:
1000mm for 90°
500mm for 45°
Flue Extension lengths:
Horizontal & Vertical 100/150mmØ: 1000mm
overall length.
Effective length when engaged into sockets
within the flue run is 950mm.
Flue Terminal lengths:
Horizontal 100/150mmØ: 1000mm
Vertical 100/150mmØ: 1290mm + cage
* to outside wall.