ED/ID Studio Office of Safety & Risk Management Rosalie Sharpe Pavilion 115 McCaul Room 2210 Studio Equipment Sa
4.2 Inspection Checklist DAILY ✔ Ensure that the power cords are free of damage. Ensure that all guards are in place and in good working orde
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before sanding Picture 1 a) Put on your PPE. Never wear gloves while usin
3. After Sanding a) Turn off the power and disconnect the sander. b) Clean the sander and the workspace. NEVER clean the machine while it is
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Nam
4.2 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By:
------------------------- This page intentionally left blank ---------------------------
Machine Hot Wire Cutter Location ED/ID Manufacturer Custom Applicable Legislation CAN/CSA-Z432-04 “Safeguarding of Machiner
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the Hot Wire Cutter Picture 1 a) Put on your PPE. Use heat resistant gl
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Nam
5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By: The Office of Safety and R
4.2 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By:
------------------------- This page intentionally left blank ---------------------------
Machine Heat Gun Model: 1584VS, 4305 Location ED/ID Manufacturer Name: Bosch Address: Robert Bosch Limited, Broadwater Park,
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Pro
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the Jigsaw Picture 1 a) Put on required PPE. b) Preselect the st
4.0 Maintenance and Repair 4.1 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and mainta
------------------------- This page intentionally left blank ---------------------------
Machine Milling Machine Location ED/ID Manufacturer Name: Busy Bee Inc. Address: 130 Great Gulf Drive, Concord, Ontario, L4
------------------------- This page intentionally left blank ---------------------------
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Proc
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Installing the Cutter Picture 1 a) Put on your PPE. Do not wear gloves when operatin
3. Milling Picture 6 a) Turn on the milling machine and allow it to reach full speed. b) Use the speed change hand wheel to choose RPM. (p
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Nam
4.2 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By:
------------------------- This page intentionally left blank ---------------------------
Machine Router Model: 3901, PR10E Location ED/ID Manufacturer Name: Makita Electric Works, Ltd. Address: 1950 Forbes Street
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
Machine Bench Grinder (8”) Model: 23-881 Location ED/ID Manufacturer Name: Delta International Machinery Address: 644 Imperial
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Pro
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the Router Picture 1 a) Put on required PPE. b) Select the router
4.0 Maintenance and Repair 4.1 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maint
------------------------- This page intentionally left blank ---------------------------
Machine Scroll Saw (16”) Model: SJ401 Location ED/ID Manufacturer Name: Makita Address: 1950 Forbes Street, Whitby, Ontario
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Pro
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before sawing Picture 1 a) Put on required PPE. b) Mark the desired area(
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2. Sawing Picture 4 a) It is unsafe to cut wood that is unsupported by the table and should never be attempted. Never use a person as a s
4.0 Maintenance and Repair 4.1. LOTO Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Name/Descr
4.2 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By:
------------------------- This page intentionally left blank ---------------------------
Machine Oscillating Spindle Sander Model: 15020-M1 Location ED/ID Manufacturer Name: General International Corporation Ltd. Ad
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Proc
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before sanding Picture 1 a) Put on your PPE. Never wear gloves while usi
3. After Sanding a) Turn off the power and disconnect the sander when not in use. b) Clean the sander and the workspace. NEVER clean the ma
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Na
4.2 Inspection Checklist DAILY ✔ Ensure that the power cords are free of damage. Ensure guards are in place and in good working order. Sande
5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By: The Office of Safety and R
------------------------- This page intentionally left blank ---------------------------
Machine Spray Booth Model: FABF-5 Location ED/ID Manufacturer Name: Paasche Address: 4311 N. Normandy Avenue, Chicago, IL 6
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Is the ventilation system turned on? 2 Is the spray booth area free of slip/trip hazards
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the spray booth a) Have the spraying material (spray cans/airbrush) r
4.0 Maintenance and Repair 4.1 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maint
------------------------- This page intentionally left blank ---------------------------
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Proc
Machine Strip Heater (heat bender) Model: EMX-1 & EMX-2 Location ED/ID Manufacturer Name: Kidder Mfg.Co.Ltd Address: 39
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 The strip heater has a plug that may be u
3.2 Equipment Specific Safe Operating Procedure (SOP) 4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure 1. Before using the Strip
LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Name/Description: Strip Heater Equipment Location: ED/ID Studio Roo
4.2 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By:
------------------------- This page intentionally left blank ---------------------------
Machine Table Saw (with Unifence Saw Guide) Model: 350 Location ED/ID Manufacturer Name: General MFG. CO. LTD. Address: 835 Ch
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the grinder Picture 1 a) Put on your PPE. Never wear gloves
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Proc
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before sawing Picture 1 a) Put on your PPE. b) Position and lock the fence a
2. Ripping (Lengthwise cuts, through a board) Picture 6 a) Place the work piece flat onto the table-it is unsafe to cut wood that is unsupported
4. After sawing Picture 11 a) Turn off the table saw and disconnect when not in use. b) Allow the saw to stop on its own accord after turning
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Nam
4.2 Inspection Checklist DAILY ✔ Ensure that guards are in place and in good working order. Ensure that the saw is secure. Ensure that the are
5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By: The Office of Safety and R
------------------------- This page intentionally left blank ---------------------------
Machine Vacuum and Heating Table Location ED/ID Manufacturer Unknown Applicable Legislation CAN/CSA-Z432-04 “Safeguarding o
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Na
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the Vacuum and Heating Table Picture 1 a) Put on your PPE. Use heat resi
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Nam
4.2 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By:
------------------------- This page intentionally left blank ---------------------------
Machine Wood Lathe Model: 1692202 Location ED/ID Manufacturer Name: Rockwell/Delta Address: 4825 Hwy. 45 North ,P.O. Box 2468
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Do you know where the emergency stop feature is located (button/switch/cord)? 2 Are gua
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before operating the lathe a) Turn on the dust collection system. 2. Securing the wor
3. Operating the Lathe Picture 7 a) Stand in front of the lathe and set the cutting tool on the tool rest. b) Hold the front of the cut
4.2 Inspection Checklist DAILY ✔ Ensure that the power cords are free of damage. Ensure guards are in place and in good working order. Machin
4.0 Maintenance and Repair 4.1. Lockout/Tagout (LOTO) Procedure: LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipmen
4.2 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By:
------------------------- This page intentionally left blank ---------------------------
5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By: The Office of Safety and R
------------------------- This page intentionally left blank ---------------------------
Machine Brad Nailer Model: BN200A Location ED/ID Manufacturer Name: Porter Cable Corporation Address: 505 Southgate Drive, Gu
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Pro
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before nailing Picture 1 a) Put on required PPE. b) Load the tool magazine
4.0 Maintenance and Repair 4.1 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and main
------------------------- This page intentionally left blank ---------------------------
Machine Buffing Wheel Location ED/ID Manufacturer Name: Allen-Bradley Address: 135 Dundas Street, Cambridge, Ontario N1R 5X
Machine Band Saw Model: K-1433fx Location ED/ID Studio Manufacturer Name: King Canada Industrial Inc. Address: 700 rue Meloch
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the buffer a) Put on your PPE. Never wear gloves while buffing;
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Nam
4.2 Inspection Checklist DAILY ✔ Ensure that the power cords are free of damage. Ensure guards are in place and in good working order. Machi
5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By: The Office of Safety and R
------------------------- This page intentionally left blank ---------------------------
Machine Disc Sander General Model: 100 Busy Bee Inc. Model: B-712 Location ED/ID Manufacturer Name: General Mfg. Corporation
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before sanding Picture 1 a) Put on your PPE. Never wear gloves while usi
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Nam
LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Name/Description: Disc Sander (General Mfg. Co. Ltd) Equipment Loca
4.2 Inspection Checklist DAILY ✔ Ensure that the power cords are free of damage. Ensure guards are in place and in good working order. Sander
5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By: The Office of Safety and Ri
------------------------- This page intentionally left blank ---------------------------
Machine Down Draft Table Model: 10-700M1 Location ED/ID Manufacturer Name: General International Mfg. Address: General inte
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the down draft table a) Put on your PPE. 2. Using the down draft tab
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Do you know where the emergency stop feature is located (button/switch/cord)? 2 Are guar
4.0 Maintenance and Repair 4.1. Lockout/Tagout Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Nam
4.2 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By:
------------------------- This page intentionally left blank ---------------------------
Machine Drill Press (17’’Drill Press) Model: KC-118FC Location ED/ID Manufacturer Name: King Canada Industrial Inc. Address:
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Do you know where the emergency stop feature is located (electrical cord)? 2 Are guards
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Installing drill bit Picture 1 a) Put on your PPE. Do not wear gloves when ope
4. Drilling Picture 5 a) Use a clamp or vice (see picture 5) to secure the material to the table via the T channels to prevent the work piece
4.0 Maintenance and Repair 4.1. LOTO Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Name/Descript
4.2 Inspection Checklist DAILY ✔ Ensure that the power cords are free of damage. Ensure that all guards are in place and in good working orde
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Proc
5.0 Document Control Any changes or updates to this document must be recorded and maintained. Initially Created By: The Office of Safety and R
------------------------- This page intentionally left blank ---------------------------
Machine Hand Drill Model: 6012D/6260D/6207D (cordless) Location ED/ID Manufacturer Name: Makita Electric Works, Ltd. Address:
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Pro
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before Drilling Picture 1 a) Put on required PPE. b) Mark the areas to be drill
4.0 Maintenance and Repair 4.1 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maint
------------------------- This page intentionally left blank ---------------------------
Machine Handheld Belt Sander Model: 9910/9911 Location ED/ID Manufacturer Name: Makita Canada Inc. Address: 1950 Forbes Street
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before sawing Picture 1 a) Put on your PPE b) Mark the desired area(s) to
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Pro
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before Sanding a) Put on required PPE. b) Never wear gloves while using a bel
4.0 Maintenance and Repair 4.1 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and mainta
------------------------- This page intentionally left blank ---------------------------
Machine Handheld Palm Sander Model: 6148 Location ED/ID Manufacturer Name: Milwaukee Electrical Tool Corporation Address: 4825
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Pro
2. Sawing Picutre 4 a) It is unsafe to cut material that is unsupported by the table and should never be attempted. Only cut wood material
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before Sanding Picture 1 a) Put on required PPE. Never wear gloves while using the
4.0 Maintenance and Repair 4.1 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and mainta
------------------------- This page intentionally left blank ---------------------------
Machine Handheld Rotary Tool Model: 275T6/285T6 Location ED/ID Manufacturer Name: Dremel Division of Robert Bosch Tool Corpora
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Pro
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the Jigsaw Picture 1 a) Put on required PPE. b) Secure the work pi
4.0 Maintenance and Repair 4.1 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and maint
------------------------- This page intentionally left blank ---------------------------
4.0 Maintenance and Repair 4.1. LOTO Procedure LOCKOUT TAGOUT PROCEDURE Equipment Identification Equipment Name/Descrip
Machine Heat Gun Model: 54-6503-0 Location ED/ID Manufacturer Name: Mastercraft Tel: 1-877-888-3872 Applicable Legislation 1.
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop
3.0 Safe Operating Procedure (SOP) This procedure is outlined as follows: General Safety Guidelines Equipment Specific Safety Operating Pro
3.2 Equipment Specific Safe Operating Procedure (SOP) 1. Before using the Heat Gun a) Put on required PPE. b) Turn on the ventilation
4.0 Maintenance and Repair 4.1 Inspection Checklist 5.0 Document Control Any changes or updates to this document must be recorded and mainta
------------------------- This page intentionally left blank ---------------------------
Machine Horizontal Belt Sander (Edge Sander) Model: PMC150 Location ED/ID Manufacturer Name: Doucet Machineries Inc. Address:
1.0 Personal Protective Equipment (PPE) Requirements PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED RECOMMENDED Face Shield / Safety Glasses wit
2.0 Pre-use Inspection Checklist Check Y N N/A 1 Are the power cords free of frays and damage? 2 Do you know where the emergency stop feat
Komentáře k této Příručce